Hewletts Flyover

Peters & Cheung carried out the detailed design of the Hewletts Flyover in Tauranga for Smithbridge. The 410m long Hewletts Flyover is one of the biggest bridges currently being built in NZ. The purpose of the bridge is to relieve congestion from the Te Puke Road leading onto the Tauranga Harbour Bridge.
more information...

Coal Haul Road

Peters and Cheung Ltd has completed the design, construction observation and contract management for the project.
more information...

Pou Kapua

The Pou Kapua or Cloud Pillar is the tallest Maori/Polynesian carving in the world. The Pou Kapua is the result of three years of intricate carving and is the largest known application of state of the art technology in glued-in-rod connections in timber
more information...

TelstraClear Pacific Events Centre

Peters and Cheung Ltd has completed the civil design and construction observation for the project. These include detailed design of 30,000m2 carpark for 750 vehicles, stormwater drainage, flood storage and sediment control pond, 10,000m2 of pedestrian plaza, building foundation construction observation.
more information...

Mohaka River Bridge

Peters and Cheung carried out the design and construction observation of the 90m long composite steel bridge deck for the Mohaka River Bridge
more information...

Newton Ramp B Bridge

As part of the upgrade to the Central Motorway Junction in Auckland Peters and Cheung carried out the structural assessment and condition survey of the existing 290m long Newton Ramp B Bridge for the Complete Joint Venture
more information...

State Highway SH1 Mercer – Long Swamp Meremere Slip Repair

The 80m long road section, Meremere Slip, of the State Highway SH1 is located adjacent to the Waikato River. Historically, this stretch of road section has been subjected to continuous slip movement and settlement following high river water level events.
more information...

State Highway SH1 Mercer – Long Swamp Re-alignment Project - South Bound Off Ramp

Peters and Cheung Ltd has been engaged by McConnell Dowell Ltd and Ross Reid Contractors Ltd as its design consultant to design a bridge abutment and approximately 95m long retaining walls for the SH 1 South Bound Off Ramp bridge near Mercer Township.
more information...

North Harbour Table Tennis Stadium Carpark Upgrade

North Harbour Table Tennis Stadium at North Shore, Auckland, New Zealand will be the host of the 2008 World Junior Table Tennis Championships, which is expected to attract at least 400 competitors from around the world.
more information...

Ashley Avenue Landslide Stabilisation Work

Peters and Cheung Ltd has completed the design, environmental management and construction observation for a 140m long 4m to 7.5m high rock-anchor tied-back reinforced concrete soldier pile retaining wall for the stabilization of a large scale landslide at North Shore of New Zealand.
more information...

Taharoto Park Carpark Upgrade Project

Peters and Cheung Ltd has completed the design, construction observation and contract management for a 27 carpark upgrade project for the Taharoto Park at North Shore, Auckland.
more information...

Tahuna Road Bridge

The Tahuna Road Bridge crosses State Highway 1 at Ohinewai, 100 km south of Auckland, New Zealand. Innovative design aspects include stabilisation of the liquefiable sand beneath the site by vibro-compaction, galvanised Keystrip ladders and single slope TL4 traffic barriers. The bridge site is underlain by a seismically liquefiable sand layer
more information...

Drury Quarry

W Stevenson & Sons Ltd have recently upgraded the production capacity of their Drury Quarry with the installation of additional primary and secondary crushers, screening plant, hoppers and conveyors. Peters and Cheung designed and carried out the construction observation of 1500 square metres of Keystone retailing walls of up to 11m high
more information...

Norbert Street cable stayed bridge

Duncan Peters was responsible for the cable replacement and strengthening of the bridge.
more information...

Hindu Dome

Raivel Precast Ltd was awarded a contract to construct seven precast concrete domes for the new Hindu Community Centre in Avondale, Auckland. The largest of these, a 5.3m diameter dome needed to be cast in two halves, each weighing 6.6 tonnes. Peters & Cheung were commissioned to advise on the structural requirements for lifting and placing the half-domes into position.
more information...

Sylvia Park Viaduct

Duncan Peters was responsible for the design of the 475m long precast beam bridge and Ka-Ching Cheung was responsible for the geotechnical design.
more information...

SH 20 Puhinui Interchange

Puhinui Interchange is a diamond interchange carrying the dual carriageway SH20 over the eastern access road to Auckland International Airport. The 8m high highway embankments are reinforced with geogrid
more information...

Carbine Road Embankment

Ka-Ching Cheung designed the award winning geogrid reinforced, light weight sand embankment with KeyStone wall facing. The embankment was supported on soft ground strengthened by stone columns.
more information...

SH1 Alpurt Sector A1 Motorway - Light weight embankment

Ka-Ching Cheung designed a 3m thick expanded polystyrene light weight embankment/pavement subgrade for the State Highway SH1 to reduce the designed 30m high embankment fill load.
more information...

Eden Park ASB Stand

Ka-Ching Cheung was responsible for all geotechnical design
more information...

Jade Stadium - South Stand

Ka-Ching carried out the geotechnical design for ground stabilisation and geogrid reinforced embankment and retaining structures for a stadium on seismically liquefiable ground.
more information...

Clear Communications Satellite Earth Receiver Station

Ka-Ching was responsible for the geotechnical investigation and design of the site development.
more information...

Southern Motorway Underpass

Duncan Peters and Ka-Ching Cheung designed of the two span precast beam bridge with soldier pile abutments which was constructed by the top down method.
more information...

SH1 ALPURT Project A1 Section

Ka-Ching was engaged by the contractor to undertake design and design review of all Mechanically Stabilised Earth (MSE) retaining walls for the bridge abutment and on-ramps and off-ramps.
more information...

Ngaere Overbridge retaining walls

Ka-Ching Cheung designed the MSE walls for Hurlstone
more information...

Middleborough Road Overpass, Melbourne

Duncan Peters designed this two span bridge for the contractor.
more information...

Boronia Underpass, Melbourne

Ka-Ching Cheung provided expert geotechnical advice on controlling uplift due to the high water table
more information...

CR Swart Rail Bridge

Duncan Peters designed the 3500 tonne award winning bridge that was built and jacked under four operating railway tracks
more information...

Maccauvlei balanced cantilever bridge

Duncan Peters carried out detailed proof checking of the contractor's design, provided expert advice and construction observation
more information...

 

Gillview Interchange, Johannesburg

Duncan Peters designed this major six span, post tensioned twin box girder bridge and two adjacent box girder bridges.
more information...

Kaaimans River bridge

Duncan Peters designed this continuous, curved reinforced concrete river bridge
more information...

Montrose Pedestrian bridge

Duncan Peters designed this graceful strutted reinforced concrete pedestrian bridge.
more information...

Middeldrift Water Tower

Duncan Peters designed this 450m 3 award winning water tower.
more information...

Viljoensdrift bridges

Duncan Peters designed the incrementally launched bridges and was Engineer to the Contract.
more information...

Naboomspruit Interchange bridge

Duncan Peters designed this tightly curved, four span, post tensioned, single cell box skew girder bridge. Duncan was design team leader for the 46 bridges and 44 major culverts of which this bridge was one.
more information...

Bisho Water Tower

Duncan Peters designed this 600m3 water tower which stands 30m high and has a diameter of 20m.
more information...

Sheet piling for Viljoensdrift Bridge

Sheet piled cofferdamn for Pier constructions on river bank.
more information...

Glenroy-Daleside Railway Bridge

Duncan Peters designed this four span continuous post-tensioned concrete box girder bridge which carries two tracks of the Glenroy Daleside line over National Route 3 between Johannesburg and Durban.
more information...

Metsemothlaba River Bridge

Duncan Peters designed this continuous reinforced concrete road bridge over the Metsemothlabla River for the Gaborone - Kanye Road in Botswana. The bridge is founded on bored piles.
more information...

Wilderness Viaducts

Duncan Peters designed 700m of viaducts on National Route 2 between the Kaaimans River and Wilderness. The inner half of the two lane highway is cut into the steep sided hill and the outer half is supported on bridgeworks.
more information...

Microwave Tower Platforms

Duncan Peters used a finite element analysis to design a precast alternative which allowed the contractor to cast the disc shaped platforms at the base of the tower and lift them up into position with three jacks.