PROJECTS
![]() |
Coal Haul RoadClient: Solid Energy New Zealand Ltd Peters and Cheung Ltd has completed the design, construction observation and contract management for the project. These include civil, pavement, and stormwater management design of a 1.4km long and 22m wide haul road, 80m long 2xDia 3m stormwater pipes for stream diversion, and 400,000 square metre of topsoil stockpile area. The heavy duty pavement is designed to carry traffic load of 155 tonne dump trucks. |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |